MAIN PAGE  
  CAULKING  
  100 / 101 Rowland  
  555 & 575 Market  
  Argent Hotel  
  Clorox Headquarters  
  Stoneridge Corp Plaza  
     
  COATING & SEALERS  
  Frank G. Mar Community  
  Gaia Building  
  Levi Plaza  
  Mt. View City Center  
  UCSF Langley Porter  
     
  DECK COATING  
  766 Vallejo  
  City Lofts  
  Kaiser: 1800 Harrison  
  USPS: 19th & Ortega  
  Watergate Tower  
     
  CONCRETE / MASONRY  
  2415 Van Ness  
  Bellevue Staten  
  Rincon Center  
  UCSF Clinical Sciences  
  Wash. Mutual DP Center  
     
  EIFS REPAIR  
  81 Lansing Street  
  Pacific Rennaissance  
     
  WATERPROOF MEMBRANES  
  UBOC- Japantown  
  101 California Atrium  
  Cupertino City Center  
     
  EPOXY / GROUT INJECTION  
  1366 Turk Street  
  Travis Air Force Base  
     
     
     

 

PROJECT Gaia Building, Berkeley
CLIENT Panoramic Interests
JOB SIZE $ 218,000 (excluding scaffold)
JOB SCOPE This picturesque stucco building in downtown Berkeley had many leaks- most at the window / stucco interface. Urban applied notched silicone tape over the joint, and applied two coats of GE Silshield to the entire exterior. Metalwork was coated with Tnemec epoxy primer and two coats of high rust inhibitive coating.
 
Gaia building exterior.
 
The stucco terminated at the window frame, and gaps there were contributing to the water intrusion issues. Urban bridged the gap with notched silicone tape, and painted the front face to match the stucco.
Scaffolding with netting at rear elevation.


 

Welcome | Services | Projects | About Us | Contact Us

©2007 Urban Waterproofing